Sale!
Placeholder

Teleconference system (63 pages) CHAPTER 1-5

10,000 3,000

63 Pages | chapter 1-5 | PDF and Microsoft Format

Project Description

Teleconference system (63 pages) CHAPTER 1-5

ABSTRACT
This project topic, Teleconference System, is one of the state of the art invention and need of many organizations for purpose of reducing cost, risk and time wastage. This project strives to bridge the geographical
distance between two or more organization. Other importance of Teleconference includes: (i) For organizations, delivery costs are reduced with resultant cost benefit in terms of time, travelling and spread of resources over large groups. (ii) Delivery of full courses, lessons, tutoring, project work and training can be provided to the students through teleconferencing. The study outlines the main concepts of the analysis and design methodology of the proposed system, compares it to the existing and goes further to explain the design and implementation of the system. System was achieved using visual basic 6.0 and run on a windows xp or higher versions. The fact finding techniques employed is interview, observation, online and library research.

TABLE OF CONTENT
Certification– — — — — — — — — — — — — — — — — — — — — i
Dedication– — — — — — — — — — — — — — — — — — — — —ii
Acknowledgement– — — — — — — — — — — — — — — — — — iii
Table of Figures– — — — — — — — — — — — — — — — — — — iv
List of tables– — — — — — — — — — — — — — — — — — — — v
Table of Content– — — — — — — — — — — — — — — — — — — vi
Abstract– — — — — — — — — — — — — — — — — — — — — — vii
CHAPTER ONE
Introduction
1.1 Background of the Project– — — — — — — — — — — — — — — — — — — — 1
1.2 Aims and Objectives of the Project — — — — — — — — — — — — — — — — 3
1.3 Justification for the Project — — — — — — — — — — — — — — — — — — — — 3
1.4 Scope of the Project– — — — — — — — — — — — — — — — — — — — — — — — 5
1.5 Project Report Organization — — — — — — — — — — — — — — — — — — — — — 5
CHAPTER TWO
Literature Review
2.1 GENERAL OVERVIEW– — — — — — — — — — — — — — — — — — — — — — — 6
2.2 Historical Concept– — — — — — — — — — — — — — — — — — — — — — — — — 8
2.3 Related Technologies– — — — — — — — — — — — — — — — — — — — — — — — 11
2.3.1 Video Calls and Video Conferencing– — — — — — — — — — — — — — — — 11
2.3.2 Virtual presence (Virtual reality) — — — — — — — 13
2.3.3 The cooperate web– — — — — — — — — — 14
2.4 Applications– — — — — — — — — — — 14
2.4.1 Connecting communities– — — — — — — — 14
2.4.2 Education– — — — — — — — — — — — 15
2.4.3 Training and Development– — — — — — — — 16
2.4.4 Teleconferencing Technology– — — — — — — — 16
2.4.5 Business and corporate Communication– — — — — — 17
2.4.6 Governance– — — — — — — — — — — 17
2.4.7 Professional and Medicinal courses and services– — — — — 17
2.4.8 21st century improvements– — — — — — — — 18
2.4.9 Present Day usage– — — — — — — — — 18
2.5 Education– — — — — — — — — — — — 20
2.5.1 Teleconference Art– — — — — — — — — 21
2.5.2 Teleconference and artificial intelligence– — — — — — 22
CHAPTER THREE
System Analysis and Design
3.1 Methodology– — — — — — — — — — — 24
3.2 Data Collection– — — — — — — — — — — 24
3.3 Analysis of the Existing system– — — — — — — 24
3.3.1 Conference layers– — — — — — — — — 27
3.3.2 Multi point conferencing– — — — — — — — 28
3.3.3 Video conferencing modes– — — — — — — — 30
3.3.4 Echo cancellation– — — — — — — — — — 31
3.4 Limitations of the Existing System– — — — — — — 32
3.4.1 System Design– — — — — — — — — — — 34
3.4.2 Input interface Design– — — — — — — — — 34
3.4.3 Output form– — — — — — — — — — 35
3.6 Program Flowchart– — — — — — — — — 36
3.8 Top Down Diagram
CHAPTER FOUR
Implementation ,Testing and Integration
4.1 Choice of development tools– — — — — — — — 37
4.2 System Requirements– — — — — — — — — 37
4.2.1 Software Requirements– — — — — — — — — 37
4.2.2 Hardware Requirements– — — — — — — — 37
4.3 Implementation System testing– — — — — — 38
4.4 Testing– — — — — — — — — — 39
4.4.3 Integration– — — — — — — — — — 41
CHAPTER FIVE
Summary, Recommendations, and Conclusion
5.1 Summary of findings– — — — — — — — –43
5.2 Limitations of the project– — — — — — — — 43
5.3 Recommendations– — — — — — — — — 45
5.4 BEME (Bill Of Engineering Measurement & Engineering) — — — 45
5.5 Conclusion– — — — — — — — — — — 46
BIBLIOGRAPHY– — — — — — — — — – 47
Appendix 1: Program Source Code– — — — — — — — 49
Appendix 2: user manual– — — — — — — — 51

GET THIS PROJECT TOPIC COMPLETE MATERIAL